December 2007 to April 2008
ForeSite Design & Construction
124 W Orion
Tempe, AZ
Civic Space Phoenix, AZ
City of Phoenix funded park in downtown Phoenix. Built in conjunction with the University of Arizona downtown campus.
July 2004 to November2007
Suft Construction
1599 E. Orangewood
Phoenix, AZ
IKEA Furniture Store Tempe, AZ
One of three superintendents on the 300,000 sq. ft. furniture store and warehouse. Primary duty was the supervision of the office space and the cafeteria. Also scheduled inspections and was Suft Constructions
representative for all inspection walk thru. On site 4 months.
Palm Creek Sales Office Casa Grande, AZ
3,000 sq. ft. circular sales office on the Palm Creek Golf and R.V. Resort. Foam and tile roof combination. Project duration 4 1/2 months.
Camelback Colonnade Pad "C" Phoenix, AZ
10,000 sq. ft. retail shell building and associated parking.
Metrocenter Exterior and Interior Renovations Phoenix, AZ
Remove and replace the 5 main entrances. Remodel the Food court and add new public restrooms along with various other interior renovations.
Lake Pleasant Towne Center Peoria, AZ
Huge strip mall with 8 Major Buildings, concrete tilt panel construction and 7 Shops of Masonry Construction
July 2003 to July 2004
Adaptive C.M., LLC
120 North 44th St
Phoenix, AZ
Avondale Nissan Avondale, AZ
Superintendent for the construction of this 55,000 sq. ft. car dealership. Two story structure with a state of the art service bay including 30 car lifts. Project included approximately 4 acres of parking.
Avondale Kia / Mitsubishi Avondale, AZ
Two separate dealerships built at the same time with a two week lag between the start of construction. Kia Dealership was 20,000 sq. ft. and the Mitsubishi Dealership was 19,000 sq.ft.
October 2001 to April 2003
Smith / Woods Contracting
7025 E. Greenway Parkway
Scottsdale, AZ
San Carlos Intermediate School and Teachers Housing San Carlos, AZ
Superintendent for the construction of the new intermediate school on the San Carlos Indian Reservation. The school consisted of 26 classrooms, an Administration area, a new kitchen, dining area, media center and computer room. On site improvements included the demolition of the existing facility
and replacing it with a new playground. The Housing Project included 13 - 900 sq. ft. duplexes for the teachers. Combined cost $7.1 m.
March 1993 to September 2001
Linthicum Constructors Inc.
!7700 N Pacesetter Way
Scottsdale, AZ
Pilgrim Rest Baptist Church Phoenix, AZ
Superintendent for the construction of a 31,000 sq. ft. building. Included Sanctuary with Baptismal Fountain, classrooms and office space. The project also included an overflow parking lot and site improvements.
Project value $6.5 m.
Yuma County Health Facility Yuma, AZ
Superintendent for the construction of a 52,000 sq. ft. county facility. Included health clinic and administration space. Site work included approx one mile of new sewer and fire line. Project value $6 m.
Yavapai Regional Medical Center Prescott Valley, AZ
Superintendent for the construction of a 30,000 sq. ft. 2 story medical office building. The building house doctor's time share. home hospice, medical records and office space. Project value $2 m.
Arizona State Prison Complex Yuma, AZ
One of two superintendents for the construction of dormitories, administration building, kitchen, health building and lock down building. Cheyenne Expansion value $14 m.
Valley Lutheran Hospital Mesa, AZ
This project consisted of the build out of the 7th floor shell space and included the addition of 25 medical/surgical patient rooms. The project also included the remodel of the 6th floor ICU, the construction of a canopy and a vestibule to the existing Women's Center. Project value $2 m.
Phoenix Memorial Hospital Phoenix, AZ
Renovation of the existing Emergency Department. The project was divided into two phases which required open communication with the ER staff in regards to scheduling overlapping activities. Value $2M
Paradise Valley Hospital Phoenix, AZ
This project consisted of renovations to Medical Records, Doctor’s Dining, Respiratory Therapy, the LDR and a two phase remodel of the Emergency Department. Project value $2 m.
February 1992 to March 1993
Johnson-Carlier
738 S 52nd Street
Tempe, AZ
Arizona Toyota Proving Grounds Whittman, AZ
This project consisted of a 25,000 sq, ft. state of the art 6 bay garage, a 50,000 gallon Booster tank for fire suppression, an industrial waste pond, septic system, carwash and approximately 3 miles of roads. Project value $8 m.
Other Projects of Interest:
Scottsdale Memorial LDR Renovations Scottsdale, AZ
Scottsdale Memorial MRI Addition Scottsdale, AZ
Mohave Valley Medical Center Bullhead City, AZ
Bullhead City Police/Courts Building Bullhead City, AZ
TSR - Propellant Manufacturing Facility Mesa, AZ
ATL/DLH Training Center - Goodyear Airport Goodyear, AZ
Gilbert Fire Station Gilbert, AZ
Page Fire/Police Station Page, AZ
University Highlands Elementary School Flagstaff, AZ
Forest Highlands Wastewater Treatment Facility Flagstaff, AZ
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.